Hostess Frito-Lay TC Line Addition
This project was an addition and renovation to the existing manufacturing facility. It included upgrades to the existing process lines, quality control lab, shipping and receiving stations, re-roofing and a 4459 m2 (48,000 ft2 ) addition for an automated storage system.
 
The construction project included the addition of a pre-manufactured metal structure that was integrated into the existing plant. All of the construction was completed and coordinated with in the operational plane with minimal disruption to production.